Skip to content

Turbining of the wastewater connection between Leysin and Aigle

RWB Vaud SA Vaud Hydro-electric plant construction work award open
Submission deadline: 17 September 2024 at 07:00
Deadline passed
Procedure: open Order type: supply SIMAP ID: 49a595f7 First seen: 5 Apr 2026 Latest publication: 21 May 2026
0
Documents
3
Changes
62
Days published

Description

Conception, fabrication, montage et mise en service des équipements hydro et électromécanique pour le turbinage.

AI Summary

The tender concerns the design, manufacturing, installation, and commissioning of hydraulic and electromechanical equipment for turbine plants. The objective is to ensure the efficiency and functionality of the equipment required for power generation.

  • Design and engineering of hydraulic and electromechanical equipment.
  • Manufacturing according to high-quality standards.

Risk overview

  • Requisiti sproporzionati1
  • Referenze1
  • Certificazioni1
  • Obbligo di consorzio1
  • Assicurazioni1
  • Scadenze1
  • Requisiti linguistici1
  • Altri ostacoli1

Change history(3)

  1. Minor

Full AI Analysis

Get the complete AI-powered analysis

Red Flags

8 flags identified — Overall risk: high

Financial Requirements

Technical Specifications

Change History

3 changes detected

See your tenders now (no signup).

Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.

About the buyer

Active now
0
All time
10
Last activity
Active in May 2026

Past awards in this category

  1. CHF 486,854Vaud
  2. CHF 448,510Vaud
  3. CHF 569,979Vaud
  4. CHF 328,097Vaud
  5. CHF 470,305Vaud

Get the full AI analysis for this tender

Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.

Start free trial
Swiss-made software

Official SIMAP data · EU hosting · encrypted backups · Swiss data protection (revFADP)

Privacy & data protection
Start free trial