Skip to content

Renovation of Salez Outdoor Swimming Pool, Sennwald

Politische Gemeinde Sennwald St. Gallen Construction work for buildings relating to leisure, sports, culture, lodging and restaurants award open
Submission deadline: 5 June 2026 at 07:00
Deadline passed
Procedure: open Order type: construction SIMAP ID: 237db4af First seen: 24 Apr 2026 Latest publication: 10 Jul 2026
1
Documents
3
Changes
11
Days published

Description

Im Rahmen der Gesamtsanierung des Freibad Salez, Sennwald wird ein neues Betriebsgebäude gebaut, sowie die Becken erweitert und neu durch CNS ausgekleidet.

AI Summary

The procurement concerns the complete renovation of the Freibad Salez in Sennwald, including the construction of a new operational building and the expansion and lining of the pools with stainless steel. The procurement is conducted through an open procedure, with partial bids not permitted. The con...

  • New construction of an operational building and expansion of the pools at the Freibad Salez.
  • Procurement conducted through an open procedure, partial bids not allowed.

Risk overview

  • Unverhältnismässige Anforderungen1
  • Konsortial- oder Partnerschaftspflicht1
  • Hohe Versicherungsmindestdeckungen1
  • Zu knappe Fristen1
  • Einschränkende Sprachanforderungen1
  • Sonstige KMU-Hindernisse1

Tender documents

1 document · 7.7 MB · PDF (1)

TypePagesSizeCategory
pdf787.7 MBForm

Change history(3)

  1. Minor

Full AI Analysis

Get the complete AI-powered analysis

Red Flags

6 flags identified — Overall risk: high

Financial Requirements

Technical Specifications

Tender Documents

1 documents available

Change History

3 changes detected

See your tenders now (no signup).

Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.

About the buyer

Active now
0
All time
8
Last activity
11 days ago

Past awards in this category

  1. CHF 539,486St. Gallen
  2. CHF 1,431,395St. Gallen
  3. Mosnang, new underground garage

    Winner:Oberhänsli Bau AG

    St. Gallen
  4. St. Gallen
  5. Renovation of Salez Outdoor Swimming Pool, Sennwald

    Winner:GWT Gesellschaft für Wassertechnik Schwimmbad und Therme GmbH

    St. Gallen

Get the full AI analysis for this tender

Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.

Start free trial
Swiss-made software

Official SIMAP data · EU hosting · encrypted backups · Swiss data protection (revFADP)

Privacy & data protection
Start free trial