Manufacture and delivery of a new dam beam winch including control with lifting device for the Innerferrera reservoir bottom outlet
Description
Herstellung und Lieferung einer neuen Dammbalkenwinde inkl. Steuerung mit Hubeinrichtung für den Stauwehr-Grundablass Innerferrera.
AI Summary
The procurement concerns the production and supply of a new winch system for dam gates, including a control system and a lifting device, intended for the discharge channel of the Innerferrera basin.
- Production and supply of a winch for dam gates.
- Integration of a control system.
Risk overview
- Requisiti sproporzionati1
- Referenze1
- Certificazioni1
- Obbligo di consorzio1
- Assicurazioni1
- Scadenze1
- Requisiti linguistici1
- Ostacoli generali1
Full AI Analysis
Get the complete AI-powered analysis
Red Flags
8 flags identified — Overall risk: high
Financial Requirements
Technical Specifications
See your tenders now (no signup).
Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.
About the buyer
- Active now
- 2
- All time
- 6
- Last activity
- 9 days ago
More tenders from this buyer
Past awards in this category
- Redesign of Grava road space, Savognin - Masonry works
Winner:Luzio Tiefbau AG
CHF 679,075Graubünden - LOT 1 Cooling water system power plant Pradella
Winner:Wagnertec AG
CHF 2,730,010Graubünden - CHF 201,628Graubünden
- Renovation of plastic floor coverings
Winner:Fetaxid AG
CHF 374,566Graubünden - IFM / Sanitation of sewer system and square drainage / BZWM, Maienfeld / BKP 411 Masonry works for the environment
Winner:Käppeli Bau AG
CHF 514,341Graubünden
Related Tenders
Get the full AI analysis for this tender
Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.
Start free trialOfficial SIMAP data · EU hosting · encrypted backups · GDPR & revFADP compliant
Privacy & data protection