Heat network Burgdorf West, BKP 230 Electrical installations
Description
Die Localnet beabsichtigt in Burgdorf eine neue Energiezentrale zu bauen. Als Grundlast werden drei Ammoniak Wärmepumpen (Quelle: Grundwasser) mit einer Gesamtleistung von 4 MW und einer Vorlauftemperatur von 80 °C installiert. Zur Nachwärmung auf 90 °C und zur Abdeckung der Spitzenlasst werden auss...
AI Summary
The procurement concerns electrical installations for the new construction of the West Heating Plant in Burgdorf, Switzerland. The works include both high- and low-voltage electrical installations and are to be awarded under a construction contract according to SIA 118. The procurement is directed a...
- Project includes electrical installations for the new construction of the West Heating Plant, Burgdorf.
- Tenders must be submitted by 31.07.2026.
Risk overview
- Unverhältnismässige Anforderungen1
- Konsortial- oder Partnerschaftspflicht1
- Hohe Versicherungsmindestdeckungen1
- Zu knappe Fristen1
- Einschränkende Sprachanforderungen1
- Sonstige KMU-Hindernisse1
Tender documents
12 documents · 2.8 MB · PDF (8) · DOCX (3) · DAT (1)
| Type | Pages | Size | Category | |
|---|---|---|---|---|
| dat | — | 225 KB | unknown | |
| 1 | 328 KB | Form | ||
| 1 | 478 KB | appendix | ||
| 17 | 301 KB | contract | ||
| docx | 1 | 114 KB | appendix |
Full AI Analysis
Get the complete AI-powered analysis
Red Flags
6 flags identified — Overall risk: high
Financial Requirements
Technical Specifications
Tender Documents
12 documents available
See your tenders now (no signup).
Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.
About the buyer
- Active now
- 1
- All time
- 1
- Last activity
- 14 days ago
Past awards in this category
- JVA Thorberg Site IS parking and storage spaces / charging stations
Winner:Kästli Bau AG
Bern - EBP-571-WV Bern-Wabern TP Network Wabern Center, builders
Winner:Frutiger AG
CHF 3,720,763Bern - BKP 281.0 Subfloors
Winner:Walo Bertschinger AG Bern
CHF 768,751Bern - CFF, Construction GC - Gare de St-Imier - La Clef nouvelle halte
Winner:Laurent Membrez SA, succursale de Delémont
CHF 4,970,869Bern - WL Rohrmatt-Tannackerstrasse
Winner:Walo Bertschinger AG Bern
CHF 893,913Bern
Related Tenders
9 days remaining
Get the full AI analysis for this tender
Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.
Start free trialOfficial SIMAP data · EU-hosted core data · encrypted in transit (TLS) · Swiss data protection (revFADP)
Privacy & data protection