Skip to content

Cluster 2025 Overhead line works

zb Zentralbahn AG, Bereich Infrastruktur Bern Catenary's construction works award unknown
Procedure: unknown Order type: unknown SIMAP ID: 391ccd4e First seen: 7 Apr 2026 Latest publication: 28 Mar 2025
0
Documents
0
Changes
481
Days published

Description

Los 1 FL Neubau: 2400m + 2200m FL Umbau: 1400m Umgehungsleitung: 1100m Hilfsleitung: 4400 m Schaltposten neu: 1Stk

AI Summary

The procurement concerns the construction and modernization of infrastructure for the electricity distribution network, including new line sections, renovation works, and the installation of a new control point.

  • Construction of 2400 meters of new line (FL Neubau)
  • Renovation of 2200 meters of existing line (FL Umbau)

Risk overview

  • Requisiti sproporzionati1
  • Obbligo di consorzio o partnership1
  • Assicurazioni con massimali elevati1
  • Scadenze troppo strette1
  • Requisiti linguistici restrittivi1
  • Altri ostacoli1

Full AI Analysis

Get the complete AI-powered analysis

Red Flags

6 flags identified — Overall risk: high

Financial Requirements

Technical Specifications

See your tenders now (no signup).

Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.

About the buyer

Active now
0
All time
9
Last activity
5 days ago

Past awards in this category

  1. Bern
  2. CHF 3,720,763Bern
  3. BKP 281.0 Subfloors

    Winner:Walo Bertschinger AG Bern

    CHF 768,751Bern
  4. CFF, Construction GC - Gare de St-Imier - La Clef nouvelle halte

    Winner:Laurent Membrez SA, succursale de Delémont

    CHF 4,970,869Bern
  5. WL Rohrmatt-Tannackerstrasse

    Winner:Walo Bertschinger AG Bern

    CHF 893,913Bern

Get the full AI analysis for this tender

Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.

Start free trial
Swiss-made software

Official SIMAP data · EU hosting · encrypted backups · Swiss data protection (revFADP)

Privacy & data protection
Start free trial