EPM Binningen - BKP 211 Building trades works
Description
Baumeisterarbeiten, Neubau eines Schulhauses, Umbau eines Bestandsbau, Arbeit in mehreren Etappen Während der gesamten Bauzeit bleibt der Schulbetrieb in vollem Umfang erhalten.
AI Summary
The procurement procedure concerns the construction and renovation works for a new school building, including both the construction of a new building and the modernization of an existing structure. The works must be carried out in multiple phases, ensuring that school activities continue without int...
- Construction of a new school building.
- Renovation of an existing building.
Risk overview
- Requisiti sproporzionati1
- Obbligo di consorzio o partnership1
- Assicurazioni con massimali elevati1
- Scadenze troppo strette1
- Requisiti linguistici restrittivi1
- Altri ostacoli per le PMI1
Change history(3)
- ——
- Critical—
- Minor—
Full AI Analysis
Get the complete AI-powered analysis
Red Flags
6 flags identified — Overall risk: high
Financial Requirements
Technical Specifications
Change History
3 changes detected (1 critical, 0 major)
See your tenders now (no signup).
Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.
About the buyer
- Active now
- 0
- All time
- 10
- Last activity
- 15 days ago
Past awards in this category
- EPM Binningen - BKP 212.2 Concrete assembly, facade
Winner:Implenia Schweiz AG
CHF 716,600Basel-Landschaft - EPM Binningen - BKP 250 sanitary installations
Winner:CBRE GWS GmbH
CHF 623,414Basel-Landschaft - EPM Binningen - BKP 112 Demolition and dismantling works
Winner:Albin Borer AG Erschwil
CHF 320,584Basel-Landschaft - EPM Binningen - BKP 244 ventilation systems
Winner:ARIATHERM AG
CHF 338,781Basel-Landschaft - EPM Binningen - BKP 230 Electrical installations
Winner:swisspro NW AG (BL)
CHF 1,408,015Basel-Landschaft
Related Tenders
Mittenza for Muttenz – Cultural House Repurposing and Renovation I BKP 224 Roofing Works
Basel-Landschaft
Mittenza for Muttenz – Cultural House Repurposing and Renovation I BKP 230 Electrical Installations
Basel-Landschaft
Primary School Boppartshof, new construction of day care and optimization of outdoor area (BKP 273.3 General joinery works)
St. Gallen
Forchbahn CLUSTER 27
Zurich
Get the full AI analysis for this tender
Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.
Start free trialOfficial SIMAP data · EU hosting · encrypted backups · GDPR & revFADP compliant
Privacy & data protection