Procurement of HVAC components and piping construction - Energy Centre Brisgi
Description
Hydraulische Einbindung Energieerzeuger und Speicher inkl. Rohrleitungen und Befestigungstechnik, Pumpen, Armaturen, Wärmetauscher, etc.
AI Summary
The procurement concerns the hydraulic integration of energy producers and energy storage systems, including the supply and installation of pipelines, fixing techniques, pumps, valves, heat exchangers, and other components necessary for the efficient operation of the energy system.
- Supply and installation of pipelines and fixing techniques.
- Integration of pumps and valves into the energy system.
Risk overview
- Requisiti sproporzionati1
- Referenze1
- Certificazioni1
- Obbligo di consorzio1
- Assicurazioni1
- Scadenze1
- Requisiti linguistici1
- Ostacoli generali1
Full AI Analysis
Get the complete AI-powered analysis
Red Flags
8 flags identified — Overall risk: high
Financial Requirements
Technical Specifications
See your tenders now (no signup).
Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.
About the buyer
- Active now
- 0
- All time
- 7
- Last activity
- 34 days ago
Past awards in this category
- Retrofitting new water meters with remote reading
Winner:Gersbach AG
CHF 152,003Aargau - Provisional school space Wohlen - Package 1 Civil engineering works - Lot 1 Bünzmatt
Winner:Notter Hochbau AG
CHF 436,434Aargau - Provisional school building Wohlen - Package 1 Civil engineering works - Lot 2 Junkholz
Winner:Notter Hochbau AG
CHF 380,053Aargau - New build reservoir Lochgasse
Winner:Cellere Bau AG
Aargau - Boniswil, rehabilitation of utilities and road Mättlistrasse
Winner:Walo Bertschinger AG
CHF 889,693Aargau
Related Tenders
Get the full AI analysis for this tender
Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.
Start free trialOfficial SIMAP data · EU-hosted core data · encrypted in transit (TLS) · Swiss data protection (revFADP)
Privacy & data protection