3. combustion line 2K5 Sub. No. 2025-43: BKP 213.9 - Steel construction 2 in selective procedure
Description
Das Projekt "2K5" umfasst die Erweiterung der Kehrichtverwertungsanlage Hagenholz in Zürich um eine dritte Verbrennungslinie (Details dazu siehe Teil B "Projektbeschrieb"). Die vorliegende Ausschreibung BKP 213.9 - Stahlbau 2 umfasst mehrere Teilobjekte im Stahlbau (siehe Beilagen im Teil E): Pos. 9...
AI Summary
The "2K5" project involves the expansion of the Hagenholz waste recovery plant in Zurich by adding a third incineration line. The tender focuses on steel works, specifically the replacement of the overhead crane track, construction of the northern roof, central warehouse, and a walkway from the cont...
- Expansion of the Hagenholz waste recovery plant in Zurich with a third incineration line.
- Steel works required: replacement of the overhead crane track, construction of the northern roof, central warehouse, and a walkway from the control center to the logistics center.
Risk overview
- Requisiti sproporzionati1
- Obbligo di consorzio o partnership1
- Assicurazioni con massimali elevati1
- Scadenze troppo strette1
- Requisiti linguistici restrittivi1
- Altri ostacoli per le PMI1
Change history(3)
- ——
- ——
- Minor—
Full AI Analysis
Get the complete AI-powered analysis
Red Flags
6 flags identified — Overall risk: high
Financial Requirements
Technical Specifications
Change History
3 changes detected
See your tenders now (no signup).
Search your company → 3–5 live tenders with blurred summaries. Unlock via magic link.
About the buyer
- Active now
- 2
- All time
- 28
- Last activity
- Yesterday
More tenders from this buyer
Past awards in this category
- Lift, fire protection and seismic renovation of MFH Neuenburgerstrasse 2 - 12, 5000 Aarau / BKP261 lift installations
Winner:Schindler Aufzüge AG
CHF 1,024,421Aargau - Lift, fire protection and seismic renovation, MFH Neuenburgerstrasse 2 - 12, 5000 Aarau / BKP 245 Smoke and heat exhaust systems
Winner:Foppa AG
CHF 891,245Aargau - Lift, fire protection and seismic renovation, MFH Neuenburgerstrasse 2 - 12, 5000 Aarau / BKP 230 electrical installations
Winner:eltec elektro AG
CHF 909,117Aargau - Neuenhof Rehabilitation Dorfstrasse
Winner:Meier Söhne Knecht AG
CHF 1,769,693Aargau - SVA Aargau_BKP 421_Gardening works
Winner:H.P. Frey Gartenbau AG
Aargau
Related Tenders
Substructure works Hardhof, Zürich Altstetten
Zurich
Realization of the Greenway Rive Droite between the Vernier and Meyrin railway stations - sector 2
Geneva
Traffic light systems, renovation of node K030, Nordring - Breitenrainstrasse, 447 traffic light systems
Bern
16.0249 - Langenthal, Renovation and extension of the vocational school: BKP 112/113 demolition, including remediation of former waste sites
Bern
Get the full AI analysis for this tender
Eligibility checklists, red flags, document intelligence, and change alerts — all in one place.
Start free trialOfficial SIMAP data · EU hosting · encrypted backups · Swiss data protection (revFADP)
Privacy & data protection